Phone System Maintenance
Description
On Wednesday 3/22/23, ITS will be performing maintenance to the phone servers. We do not anticipate an outage.
Last updated: 3/29/23 1:10 pm
Description
On Wednesday 3/22/23, ITS will be performing maintenance to the phone servers. We do not anticipate an outage.
Description
The third floor data closet network equipment is down due to a water pipe break resulting in switch failure. This will affect upper floors in Research as well. Facilities is aware of the issue, no ETA for repairs.
2/27/23 11:30am
network equipment is back operational
Description
networking will be doing maintenance on the tower networking equipment on 2/19/2023. Service may be impacted in that area at this time.
Primary Contact: Joshua Ballenot 3145164116
Description
Networking will be upgrading equipment in Villa residential Hall on 11/13/2022. During this time internet and VOIP phone services may be interrupted.
Primary Contact: Joshua Ballenot 3145164116
Description
The ITS network group will be upgrading equipment in the Tower networking closet. During this time internet access and desk phones may lose connection.
Primary Contact: Joshua Ballenot 3145164116
Description
There has been a hardware failure for the network equipment on the first floor of the Research Building. ITS is working towards resolving the issue.
9/19/22 11:40am Failed network switch has been replaced.
Description
Networking will be consolidating connections, so a few people might be temporarily disconnected from networking and telephone, please call if problem persists after outage is completed.
Primary Contact: Pollyana Appleton x6026
Description
Campus-hosted IT services are currently unavailable. The problem is being investigated.
Description
Telephone Services will be performing reboots overnight of all Mitel servers to resolve multiple issues caused by recent power outages. During this time, campus telephone service will be unavailable. The maintenance should be complete in roughly 2 hours.
The overnight maintenance was completed successfully.
Primary Contact: Andrea Quinn